Final rule published

Drawbridge Operation Regulation; Wishkah River, Aberdeen, WA

Record date · Nov 6, 2026

What this means

Status
Final rule published
What happened
The Coast Guard is changing the operating schedule that governs the Puget Sound and Pacific railroad bridge (PS&P) across the Wishkah River, mile 0.1 in Aberdeen, WA. This rule will change the PS&P railroad bridge draw position to the fully closed-to-navigation position. Furthermore, this rule requires 24-hour notice for all drawbridge openings and a bridge operator will no longer be required to be on site.
What to check next
The published rule gives Dec 7, 2026 as its effective date. Check the official docket for later changes.
Check the original record

Record details

Federal Register document
2026-22677
Stated effective date
2026-12-07

Sources and related records

Source checked .